Watch the Cres Skip Carrier being delivered
In September, Allfab was engaged to replace a structural section on a Cres Skip Carrier. This work was completed in one of our three large workshops located in Port Kembla.
Watch the delivery below.
Part 1: Cres Skip Carrier being delivered to Allfab Constructions workshop in Port Kembla for breakdown work to replace a structural section.
Part 2: Cres Skip Carrier being delivered to Allfab Constructions workshop in Port Kembla for breakdown work to replace a structural section.

